Saturday 6 April 2013

About bloody time. . .

 Well Friday couldn't come quick enough for poor old Johnny. After being ripped off with no work on his trike for the last two Fridays, it was finally time to get the beast ( the trike that is, not Johnny) back up onto the rack and getting some work done. . .come to think of it we could probably put Johnny up on the rack and give him a bit of a clean up?
Dave's started work on the cooling system with the front plate and first of the radiator hoses under way. . .

Water cooling system hoses are hand made steel and weaves its way rearwards to this Davies Craig electric water pump and then on to the rear mount radiator and then down the other side and back to the front of the head. Metal fabricated box is to hold te battery for the trike's power system. While maintaining a small overall size it has to hold some cranking power as it's a car motor that it's gotta start, not some piss-ant Harley clunker. . .

No comments: