Friday, 15 March 2013

Johnny's Trike. . .


Inlet manifold has now been finished and carby mounted and cabled up ready to go. Hand fabricated piping in and around the frame is a very time consuming process and sometimes it's one step forward and then two steps back. . .

Mounting bracket for the gear selector cable for the Trimatic gearbox. This is the first incarnation and will probably end up getting fiddled with for perfect positioning.

This is the problem area with the trike sitting so low and the selector lever swinging down to a clearance height of only 75mm things are gonna have to change down here? Remember that four exhaust pipes have to run through here also. . .

No comments: